Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the userpro domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u768393806/domains/investmentbell.com/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the userpro-rating domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u768393806/domains/investmentbell.com/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the permalink-manager domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u768393806/domains/investmentbell.com/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rocket domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u768393806/domains/investmentbell.com/public_html/wp-includes/functions.php on line 6121

Notice: Fungsi _load_textdomain_just_in_time ditulis secara tidak benar. Pemuatan terjemahan untuk domain td-cloud-library dipicu terlalu dini. Ini biasanya merupakan indikator bahwa ada beberapa kode di plugin atau tema yang dieksekusi terlalu dini. Terjemahan harus dimuat pada tindakan init atau setelahnya. Silakan lihat Debugging di WordPress untuk informasi lebih lanjut. (Pesan ini ditambahkan pada versi 6.7.0.) in /home/u768393806/domains/investmentbell.com/public_html/wp-includes/functions.php on line 6121
Israeli Lead Producer To Use ACE Green Emissions-free Recycling | InvestmentBell

BeritaKomoditasProdusen utama Israel menggunakan daur ulang bebas emisi ACE Green

Produsen utama Israel menggunakan daur ulang bebas emisi ACE Green

LONDON (Reuters) – U.S.-based ACE Green Recycling, which has developed a lead battery recycling process with no greenhouse gas emissions, said it will deploy its technology to Israel’s Hakurnas Lead Works.

The deal to set up the processing at Hakurnas’ facilities in Israel and Romania will progressively create 50,000 metric tons of annual lead battery recycling capacity, worth $60 million of lead metal sales a year, ACE Green added in a statement.

Initial operations using ACE Green’s equipment are expected to commence at the Hakurnas plant by the fourth quarter.

ACE Green’s technology replaces the hot smelting process for lead battery recycling with one at room temperature, running on electricity.

It has been developed in response to bets that demand for recycled metals, especially with healthy environmental footprint, would rise with the global energy transition.

In December, ACE Green signed a 15-year agreement which allows for global miner and trader Glencore (OTC:GLNCY) to purchase up to 100% of its products from its planned lead-acid and lithium-ion battery recycling parks in several countries.

0
ARTIKEL TERKAIT
video
bermain-bulat-mengisi

Paling Populer