Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the userpro domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u768393806/domains/investmentbell.com/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the userpro-rating domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u768393806/domains/investmentbell.com/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the permalink-manager domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u768393806/domains/investmentbell.com/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rocket domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u768393806/domains/investmentbell.com/public_html/wp-includes/functions.php on line 6121

Notice: La función _load_textdomain_just_in_time ha sido llamada de forma incorrecta. La carga de la traducción para el dominio td-cloud-library se activó demasiado pronto. Esto suele ser un indicador de que algún código del plugin o tema se ejecuta demasiado pronto. Las traducciones deberían cargarse en la acción init o más tarde. Por favor, ve depuración en WordPress para más información. (Este mensaje fue añadido en la versión 6.7.0). in /home/u768393806/domains/investmentbell.com/public_html/wp-includes/functions.php on line 6121
Kazakhstan Takes Oil Majors To Arbitration Over Costs | InvestmentBell

Noticiasmaterias primasKazajistán lleva a grandes petroleras a arbitraje por costos

Kazajistán lleva a grandes petroleras a arbitraje por costos

ASTANA (Reuters) -Kazakhstan has started arbitration proceedings against companies developing its Kashagan and Karachaganak oilfields over $13 billion and $3.5 billion respectively in costs deducted as part of profit-sharing deals, its energy minister said on Tuesday.

“I can only say these lawsuits have been filed in the interest of the people of Kazakhstan,” Energy Minister Almasadam Satkaliyev told reporters, declining to provide any further details about the claims.

The offshore Kashagan field, one of the biggest discoveries in recent decades, is being developed by Eni, Shell (LON:RDSa), TotalEnergies, ExxonMobil (NYSE:XOM), KazMunayGas, Inpex and CNPC.

Eni, Shell and KazMunayGaz are also partners in Karachaganak, alongside Chevron (NYSE:CVX) and LUKOIL.

The two consortia’s offices in Kazakhstan did not reply to requests for comment.

Both projects are covered by production-sharing agreements stipulating that companies can deduct certain costs from income before splitting it with the government. The size of the deductions determine how much income there is to be split.

Kashagan and Karachaganak, both of which pump around 400,000 barrels of oil per day, are the second and third biggest producers of oil respectively in the Central Asian nation whose economy relies heavily on energy exports.

The Astana government has already had a series of disputes with its partners about the terms of oil deals, which typically ended with settlements.

According to a Bloomberg report published this month, the claims cover the period from 2010 to 2018 for Kashagan and from 2010 to 2019 for Karachaganak.

Kazakhstan and the Karachaganak consortium settled their most recent dispute in 2018 after three years of negotiations, with the group paying Astana $1.1 billion and giving it a greater portion of future profits.

0
ARTÍCULOS RELACIONADOS
video
jugar-redondear-llenar

Más popular